TMPlans provides drawings and visualisations using traffic management plans-cone software and Autodesk AEC design tools for the best quality products available.

A329 London Road Improvements – Martins Heron Roundabout, Bracknell

TM Plans were requested by CD Traffic Management to design a full road closure of all the approaches to Martins Heron Roundabout in Bracknell with 4 separate diversion routes. This drawing comes on the back of multiple phase TM Plans we provided last year to assist with the construction of the new road layout.
The full road closure will be in place for the installation of intelligent permanent signals which is programmed to finish by February 2019.
The works would have been completed sooner but due to to a well-publicised water leak and issues with underground utilities it has prolonged the contract into the new year.
TM Plans has assisted and overseen the design of over a dozen drawings for this project.

 

 

 

 

 

 

Bracknell Forest

CD Traffic Management 

Lea Bridge Road – London

We have assisted Chigwell Construction with the traffic management design on Lea Bridge Road – London for them to work on the adjacent building. A crane will be situated on the footpath and bus lane eastbound. Pedestrians will be diverted into the road protected by pedestrian barrier and 2-way traffic lights.

 

A5 – Rugby – New Roundabout Construction

Multiple Traffic Management Plans completed for another major project, this time for the construction of a new roundabout on the A5 in Rugby.

Although most of the work will be completed under road narrows; the speed limit need to be reduced from national speed limit to 40mph. Once the main kerb line has been constructed it will be time for resurfacing and construction of the islands which will be done under a road closure. We’ve created a plan to divert traffic around this road closure using 2 routes, the M1/M6 and local traffic running through Rugby Town Centre.

We have attached one of the traffic management phases which is a good example of how the traffic will be managed most of the time and also another plan showing the diversion route(s).

TM Plan for London Road in Ascot – Outside LVS Ascot School & Sixth Form

This is the first of many traffic management phasing plans completed today to allow works to start on a new road layout for London Road in Ascot, outside LVS School and Sixth Form. This particular phase has allowed for work to take place in the existing footpath by setting up a temporary pedestrian walkway complete with 2 temporary pedestrian crossings.

TM Plan for ducting installation on the A38 in Trerulefoot, Slatash, Cornwall

This is just 1 of 9 Traffic Management Plans produced for our client, this time so they can install ducting along the A38 safely and efficiently. Temporary Traffic Lights will be in place along the A38 towards Trerulefoot and north of the railway bridge.